Construction well underway at Northbridge
Located at a phenomenal harbourside site with stunning views, DKC are delighted to announce that construction is well underway at the Northbridge Residence.
Starting from a brief to design a new boatshed, this project has evolved into a masterplan for the site and existing house. The scope of the project includes a new carport and lobby, covered walkway and perimeter roofing to the existing house, a pool and cabana and a new landscaped walkway down to the boatshed. Subsequent planning applications have been lodged for an inclinator connecting the house down to the boatshed, and an extensive renovation to the existing house.
The project has progressed through a number of obstacles including a drawn out planning process, managing threatened flora, requirements for bushland regeneration as well as strict BAL-FZ construction requirements. Construction on the steep site has progressed quickly, despite issues such as access, and ongoing wet weather on the construction process. DKC are excited to continue developing the project with our client as construction continues.